Customer :

Transnet

Role :

EPC Contractor

Key date :

May 2008 to April 2011

Location :

South Africa - South Africa

Description of the Project

This multi-product pipeline transports, at high pressure, petroleum products from Durban to the province of Gauteng (Johannesburg).

Work done and added value of our solution

The project, which was carried out in challenging locations in pristine or industrial settings, includes a main pipeline (544 km long, 24 inches in diameter) between Durban and Gautenberg, and several secondary lines (160 km long, 16 inches in diameter) linking Kendal to Waltloo, Jameson Park to Alrode, and Alrode to Langlaagte.